A preferred bidder has been selected for the tunnelling package for North East Link, which will fix the missing link in Melbourne’s freeway network, slash travel times and free up local roads for local trips.
The successful bidder will construct the twin three-lane tunnels and key interchanges.
Spark has been selected as the preferred bidder to deliver the tunnelling package.
Check out the link below for the full story!